
Developer Handover in Poland: How to Inspect Your Apartment
· 6 min read · Polski · ES · Українська
At handover, a developer gives you the apartment and a handover protocol. Inspect it carefully, list every defect with photographs, record them in the protocol and agree a date for repairs before you accept the keys. Take a technical expert if you can, and do not sign a protocol that omits defects you found.
Key takeaways
- Handover is the moment to record defects in writing, so prepare before the appointment.
- A checklist and an experienced person with you make the inspection more reliable.
- Record every defect in the protocol, with a repair date, and keep your own photographs.
- Statutory rights for defects exist, but a clear protocol makes them easier to use.
- The transfer deed that moves ownership follows the handover in the usual sequence.
What is the sequence from developer agreement to ownership?
In a typical purchase from a developer in Poland, the steps go like this: you sign the developer agreement, you pay in stages, the building is completed, the apartment is handed over to you, and the transfer deed is signed in front of a notary. The deed is the step that moves ownership, and your entry in the land register follows. Details can differ by developer and agreement, so read your own contract.
Our article on buying from a developer in Poland explains the protection at each step. This guide focuses on the handover. For the legal checks that come before any payment, use our due diligence checklist for Poland.
How should you prepare for handover?
Preparation makes the difference between a calm inspection and a rushed one.
- Read the agreement and the specification. Know what the developer promised: materials, finishes, area, equipment.
- Get the plans. Bring the apartment plan with dimensions and the technical specification.
- Plan the time. A thorough inspection takes hours, not minutes. Choose daylight.
- Bring tools. A torch, a spirit level, a tape measure, a socket tester, a ruler, masking tape to mark defects and a phone for photographs.
- Bring a person. A technical expert, a surveyor or an experienced friend sees what you may miss.
- Decide who signs. If you cannot attend, check that the power of attorney is valid. Our article on buying remotely with a power of attorney explains the form.
What should you check in the apartment?
| Area | What to check |
|---|---|
| Walls and ceilings | Cracks, flatness, paint, plaster quality, corners |
| Floors | Level, gaps, scratches, hollow sounds, expansion joints |
| Windows and doors | Opening, closing, seals, glass condition, handles, locks |
| Electrics | Sockets and switches work, distribution board labelled, lights |
| Plumbing and heating | Water pressure, leaks, drainage, radiators or floor heating |
| Ventilation | Air flow in kitchen and bathroom, no mould or damp spots |
| Bathroom | Tiles, silicone joints, falls to drains, fittings |
| Balcony and terrace | Drainage, railings, waterproofing |
| Area and layout | Compare room sizes and layout with the plan |
| Common parts | Staircase, lift, entrance, parking, storage unit |
Test everything that can be tested: open each window, run every tap, flush each toilet, switch on each light and socket, and run the heating. Check hidden spots behind doors, inside cupboards and under the sink.
How do you record defects?
A defect that is not written down is easy to dispute. Use a simple method:
- Number each defect and mark it on the plan.
- Take a wide photograph and a close photograph of each.
- Describe the defect in plain words: where, what, how big.
- Ask the developer’s representative to enter each defect in the protocol.
- Ask for a repair deadline for each defect, or for a general deadline, written in the protocol.
- Keep your own copy of the protocol and the photographs.
Do not accept a statement such as “we will fix it later” without a written note. If the developer’s representative refuses to record a defect, write it in a separate letter and send it by a method that shows delivery.
Should you accept the apartment with defects?
You can accept an apartment with defects if they are recorded and the developer commits to repairing them. Minor defects, such as paint touch ups, are common. Serious defects, such as damp, structural cracks or non working installations, deserve more caution. In such cases, ask your lawyer about your options, including the right to refuse acceptance until the problem is fixed and the contractual remedies for delay.
Do not sign a protocol that says the apartment is without defects if you have found problems. If you are unsure, ask for a break to consult a lawyer, and arrange a second visit.
What rights do you have after handover?
In Poland, a seller or developer is responsible for defects in what they deliver, under statutory rules on warranty for defects and under the contract. The time limits and the procedure depend on the rules and on your agreement, so ask a lawyer to explain them for your case. A clear handover protocol and a record of later notices make it easier to enforce these rights.
After you move in, report newly discovered defects in writing as soon as you find them, keep photographs, and keep a log of the developer’s answers. Do not make repairs yourself before you speak to the developer and a lawyer, because you may affect your claim.
What about the transfer deed?
After the handover, the transfer deed is signed in front of a notary. At that point, make sure that all payments have been made as agreed and that the notary has the documents. You will receive the deed and the land register entry follows.
What happens after you receive the keys?
You become responsible for utilities, insurance and housing community charges, and can begin furnishing and renovating. If you plan renovation, check the building rules and the schedule of the community. Our overview of turnkey apartment finishing in Warsaw explains how a one team approach can work for a new apartment.
Frequently asked questions
How long should a handover inspection take?
Allow several hours for a typical apartment, and avoid a rushed visit. A second visit is possible if you need more time, and it is better to schedule one than to sign in a hurry.
Do I need an expert for the handover?
It is not required, but an expert sees problems that most buyers miss, such as hollow floors, poor installation details and ventilation issues. Many buyers find the cost worthwhile.
What if the developer does not repair the defects?
Keep written records and send a formal notice. Ask a lawyer about your rights under the agreement and the statutory rules. Do not stop payments or make repairs yourself without advice.
How Kaster Group can help
Kaster Group works from Warsaw with buyers from Europe and beyond, and supports the search, the coordination with a notary and a lawyer and, if the apartment needs it, the renovation by one team. The Spanish group behind Kaster has more than 10 years of experience in the real estate sector in Spain.
If you own an apartment in Warsaw and want a quick first reference for its market range, you can ask for a free indicative valuation. It is an estimate, not a formal appraisal. Write to info@kastergroup.eu.
This article is general information, not legal or tax advice. Rules change; always confirm your situation with a notary, lawyer or tax adviser.


